Repiping
Phased repipe of a 1920s foursquare
Corroded galvanized supply lines replaced with PEX, one floor at a time.
Location
Longfellow, Minneapolis
Home
1920s foursquare
Time on site
Phased over one week
Scope
Whole-home repipe

01
The challenge
Weak pressure upstairs, rusty water first thing in the morning, and two pinhole leaks in a single year.
02
Our approach
We mapped every run, worked floor by floor, kept wall openings small, and restored water each evening.
03
The outcome
Strong, even pressure on every floor, clear water, and a passed inspection.
On the job
Project photos.

